Metal Coping Detail
Description
IMI Detail 01.030.0803. This masonry top of wall detail shows a metal coping held in place with a continuous cleat. The coping slopes to the roof to shed water. The roof structure bears on a bond beam, part of the loadbearing masonry system. The wall has a 2" clear air space for drainage, and weep vents are spaced at 24" o.c. There is an air/moisture/vapor barrier on the cavity side of the CMU, and 2" rigid insulation resides in the drainage cavity. This detail is intended for the use of industry professionals who are competent to evaluate the significance and limitations of the information provided herein. This detail should not be used as the sole guide for masonry design and construction, and IMI disclaims any and all legal responsibility for the consequences of applying the information. #AIA #air_barrier #BAC #block #bond_beam #brick #bricklayer #cavity #CMU #Conwell #coping #drainage #flashing #green #highperforming #IMI #IUBAC #masonry #MDS #metal_coping #mortar #roof #sustainability #sustainable #top_of_wall #wall_tie #weeps
Default Title