Water Turbine

Water Turbine

Akhil P.
The UTM microturbine has an output of 240 Kilowatts. The microturbine, located in the Engineering and Grounds Building, was installed at UTM in January 2005 and has since been operational for more than 8000 hours. It provides an estimated 20 percent of UTM's total power. #Erindale_Campus #Power_Generator #University_of_Toronto_Erindale #UTM #Water_Turbine
Default Title